Skip to content
Electrical panel upgrade completed in Northbrook by Nailed It North Shore licensed electrician

Electrical · North Shore

Electrical Panel Upgrades and Power on the North Shore

By Michael Stryszowski, licensed electrician · Updated

Nailed It North Shore is a licensed electrician in Northbrook. Panels and power is the category: the service, the panel, the circuits that feed the house, and the protection on them. On older North Shore houses — many 1950s–1970s ranches still on 60- or 100-amp service — we look at the panel and meter first. If an upgrade is the right work, we pull the permit and meet the village inspector. We do not service the City of Chicago.

Certified if the next step is an EV charger

A panel upgrade is often the first step toward a car charger. We are ICC Certified EV Charging Installers and ChargePoint Certified — so if the new service can take a dedicated circuit, the charger is work we already do.

  • Lutron

    Professional

    Smart lighting and controls

  • ICC

    Certified EV Charging Installer

    Dedicated EV circuits, to code

  • ChargePoint

    Certified Installer

    Listed EV charging equipment

  • Generac

    Certified

    Standby generator installation

Licensed electrician · Bonded & insured · Manufacturer-trained

When a panel needs doing

Breakers that will not stay on. A dryer and an oven that cannot run together. No room for an EV charger or a generator. Warm covers. Those are the houses we see on the North Shore — not a mystery, just a service that has not kept up.

  • Older 60- or 100-amp services that were never meant for today’s load
  • Full panels with no space for a dedicated circuit
  • Federal Pacific, Zinsco, and other equipment we will not leave in place
  • A kitchen, bath, or addition that the existing service cannot feed

Panels and power, by job

The panel is where every circuit in the house meets. These are the jobs that live in this category.

  • Service upgrades — meter, mast or lateral, grounding, and a new panel when the house has outgrown 60 or 100 amps
  • Panel replacement — swapping a full, failing, or recalled panel on a service that is otherwise sound
  • Subpanels — a second panel in the garage, basement, or addition when the main is full but the service can carry more
  • Dedicated circuits — ranges, dryers, ovens, sump pumps, the basement fridge, and the island that needs its own breaker
  • Whole-house surge protection — at the panel, so electronics, appliances, and HVAC boards are not riding out every grid blip unprotected
  • Rewiring — aluminum branch circuits pigtailed or replaced, two-wire receptacles grounded, and undersized runs brought up to the load

Power for the way the house runs now

A 1960s service was sized for one oven, a window unit, and a garage with a lawn mower in it. The same house now wants central air, an induction range, an electric dryer, a charger, and maybe a generator. We look at the whole load, not one appliance, and say whether the service, the panel, or a single circuit is the right work.

What to expect

A licensed electrician looks at the service first. We tell you whether a new breaker, a subpanel, or a full service upgrade is the right work — and we do not pad extras onto the number.

  1. We look at the panel, the meter, and how the house is used.
  2. You get a clear estimate. If the charger, generator, or kitchen is driving the work, we say so.
  3. We pull the permit. The village inspects the work.
  4. The new panel is labeled. You know what feeds what.

Code notes for older houses

North Shore villages want the work inspected. We pull the permit. We do not ask a homeowner to open a panel. Grounding, bonding, and the run from the meter are part of doing it once.

Same crew in Northbrook, Winnetka, Glencoe, Highland Park, and Lake Forest. If the panel is the first step toward a kitchen or a charger, we stay on the job.

What an upgrade involves

A service upgrade is the meter, the mast or lateral, the grounding, and the new panel. The house loses power for a planned window. We tell you how the day looks. Federal Pacific and Zinsco equipment comes out — we will not leave it. The new panel is labeled so the next person in the house can find the kitchen, the charger, and the dryer.

What moves the number

The panel itself is rarely the whole line. Distance from the meter, a mast versus an underground lateral, Federal Pacific or Zinsco that has to come out, grounding that was never done, and whether a charger or a generator is riding along — those move the estimate. We do not publish a fake starting price. You get a number after we look.

Subpanels versus a new service

Sometimes a subpanel in the garage is enough for a charger. Sometimes the utility has to set a larger service. We do not sell the larger job if the smaller one is safe and legal. That is the look in person.

Whole-house surge protection

A surge device at the panel catches what a power strip cannot: the spike that rides in on the service when a line goes down or the grid switches. It is a short job when the panel has room, and it is worth doing at the same time as an upgrade. We install listed devices at the panel and label them.

Electrical, by category

Before you call

Straight answers.

Can your Northbrook panel handle an EV charger?
The charger is the easy part. The panel is the question. A licensed electrician looks at the service first. If there is room for a dedicated circuit, we install listed equipment, label the breaker, and leave it ready for daily use. If the service is still 60- or 100-amp, we say so before anyone opens a wall. When an upgrade is the right work, we pull the permit so it can be inspected.
Are you a licensed electrician?
Yes. Licensed electrician, based in Northbrook. Call (847) 778-8053 or request a visit.
If I upgrade the panel, can you add an EV charger later?
Yes. We are ICC Certified EV Charging Installers and ChargePoint Certified. If the new service can take a dedicated circuit, we can install the charger on a later visit — or on the same job if that is the plan.
Will the house lose power?
A service upgrade means a planned outage while we swap the equipment. We tell you how the day looks before we start.
Do you pull the permit and meet the inspector?
Yes. North Shore villages want panel work inspected. We pull the permit. We do not ask a homeowner to open a panel. Grounding, bonding, and the run from the meter are part of doing it once.
How do I know if I need a panel upgrade or just a new circuit?
Look at what trips. One appliance on one breaker is usually a circuit. Breakers tripping in different rooms, warm covers, a full panel, or no room for a charger point at the panel or the service. We look in person and tell you which.
Do you replace Federal Pacific and Zinsco panels?
Yes, and we do not leave them in place when we find them. If your Northbrook or Winnetka house still has one, that is the panel conversation.
What is a subpanel, and when is it enough?
A subpanel is a second panel fed from the main. When the main is full but the service can carry more, a subpanel in the garage or basement adds breaker space without a utility upgrade. When the service itself is the limit, it is not enough. We say which on the visit.
Do you install whole-house surge protection?
Yes. A listed surge device at the panel, labeled, often on the same visit as a panel upgrade or a new circuit.
Can you add a dedicated circuit for a range, dryer, or sump pump?
Yes. Appliance circuits are the everyday side of panels and power — a breaker, a run, and a receptacle sized for the load. If the panel has no room, that becomes the panel conversation first.

Northbrook · Call anytime

Want us to look at the house?

Call anytime, or request a visit. We will look at the work, give you a clear number, and do it right the first time.

Call (847) 778-8053